ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN P. GOMEZ STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 80
Distress (block crack) // pumping 27.9 sq.m 4 cm 2.3 cm 19 13.88531 120.9095
Popouts and Wornouts 27.9 sq.m 19 13.88531 120.9095
35 13.885117 120.910013
Pumping and seeping 36 sq.m 8 m 4.5 m 22 13.8849 120.9096
Sangalang St/In 37 13.88528 120.9102
Block Cracking 0.5 l.m 0.5 m 3 cm 1.6 cm 38 13.88515 120.91
41 13.885367 120.910394
Transverse Crack 3.1 l.m 3.1 m 2.5 cm 1 cm 44 13.885414 120.910475
Corner Crack 0.5 l.m .5 m 1.5 cm 1 cm 46 13.88535 120.9101
Pumping and seeping 36 sq.m 8 m 4.5 m 46 13.88535 120.9101
Filipinismo St/In 50 13.88356 120.9107
scaling 0.155 sq.m 3.1 m 5 cm 2.6 cm 64 13.88547 120.9101
Diagonal crack (4pcs) 0.496 l.m 3.1 m 4 cm 2.2 cm 66 13.88551 120.9102
68 13.88551 120.9102
Igualidad St/In 72 13.88617 120.9117
/E 80 13.88553 120.9103
Note: Legend: /E - End
1. The data is surveyed last February 23, 2022. /In - Intersection
2. The unit of measure l.m denotes linear meter.
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com