| LEMERY, BATANGAS | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| SURVEYED PAVEMENT DISTRESS IN P. GOMEZ STREET | |||||||||
| Defect(s)/Deficiencies | Estimated Quantity | Unit of Measure | Remarks | Length | Width | Depth | No. of Slab | Latitude | Longitude |
| Total: 80 | |||||||||
| Distress (block crack) // pumping | 27.9 | sq.m | 4 cm | 2.3 cm | 19 | 13.88531 | 120.9095 | ||
| Popouts and Wornouts | 27.9 | sq.m | 19 | 13.88531 | 120.9095 | ||||
| 35 | 13.885117 | 120.910013 | |||||||
| Pumping and seeping | 36 | sq.m | 8 m | 4.5 m | 22 | 13.8849 | 120.9096 | ||
| Sangalang St/In | 37 | 13.88528 | 120.9102 | ||||||
| Block Cracking | 0.5 | l.m | 0.5 m | 3 cm | 1.6 cm | 38 | 13.88515 | 120.91 | |
| 41 | 13.885367 | 120.910394 | |||||||
| Transverse Crack | 3.1 | l.m | 3.1 m | 2.5 cm | 1 cm | 44 | 13.885414 | 120.910475 | |
| Corner Crack | 0.5 | l.m | .5 m | 1.5 cm | 1 cm | 46 | 13.88535 | 120.9101 | |
| Pumping and seeping | 36 | sq.m | 8 m | 4.5 m | 46 | 13.88535 | 120.9101 | ||
| Filipinismo St/In | 50 | 13.88356 | 120.9107 | ||||||
| scaling | 0.155 | sq.m | 3.1 m | 5 cm | 2.6 cm | 64 | 13.88547 | 120.9101 | |
| Diagonal crack (4pcs) | 0.496 | l.m | 3.1 m | 4 cm | 2.2 cm | 66 | 13.88551 | 120.9102 | |
| 68 | 13.88551 | 120.9102 | |||||||
| Igualidad St/In | 72 | 13.88617 | 120.9117 | ||||||
| /E | 80 | 13.88553 | 120.9103 | ||||||
| Note: | Legend: | /E - End | |||||||
| 1. The data is surveyed last February 23, 2022. | /In - Intersection | ||||||||
| 2. The unit of measure l.m denotes linear meter. | |||||||||